
Shifting Vehicle
TTC01Traversing carriage | Emphasizes operational convenience and stable machining
View Details→
Installed Line Layout
Packing Area Integration
Panel Transfer Staging
Workshop Buffer Station
Installed Line Layout
Packing Area Integration01 /Description
Simple gravity-assisted workshop transfer
Gravity Roller Conveyor. Application settings include Installed Line Layout; Packing Area Integration; Panel Transfer Staging; Workshop Buffer Station. Match the selected configuration to the available space, access and intended use before ordering.
02 / Specs & Parts


The complete conveying unit forms the primary material support surface and line interface.
The main conveying surface supports staged workpieces or cartons across the frame.
This verified structural group provides the product's directional or vertical transfer function.
Parallel side members retain the conveying surface and define the usable path.
Cross members tie the frame together and improve stability on the floor.
Supports keep the frame at a stable working height and allow installation alignment.
The visible drive or control group provides the configured interface for setup and inspection.
03 / Specs, Parts & Accessories
Video Showcase
URLO1 machine display, rugged frame, equipment performance visible directly
Video Showcase · 00:32URLO1 machine display, rugged frame, equipment performance visible directly
Service Videos · 00:15URLO1 machine container loading, reinforced fixation to guarantee safe and stable ocean freight
Service Videos · 00:32URLO1 packed in export wooden case with built-in buffer protection to avoid damage in long-distance shipment
Real on-site records from our factory, offering a practical view of our production capability and delivery readiness.
It is intended for material transfer and staging between woodworking, packing, inspection, or warehouse workstations shown in the supplied scenes.
No. The supplied application images present static installed layouts and staging positions rather than an operating demonstration.
Confirm the handled material, dimensions, weight, transfer direction, working height, connection points, and available floor space before ordering.
Layout adaptation should be confirmed with the supplier using the actual production-line drawing and site dimensions.
The standard procurement response time is within 24 hours after the model, quantity, layout, and special requirements are confirmed.