01 /Description

Practical excavation across managed sites

Controlled digging for compact outdoor work

ECO Mini Crawler Excavator. Application settings include Landscape Edge Work; Foundation Preparation; Field Drainage Work; Garden Bed Forming. Match the selected configuration to the available space, access and intended use before ordering.

02 / Specs & Parts

Specifications & Structural Decomposition

Product Structure Diagram

ECO Mini Crawler Excavator
Operating weight/tonnage: 2.0tonStandard engine model: Laidong 385 diesel enginePower: 22.1KW
Operating weight/tonnage
2.0ton
Standard engine model
Laidong 385 diesel engine
Power
22.1KW
Optional engine
Laidong385BT(18.8KW), Kubota D722(10.2KW),
Optional Configuration
Chassis telescopic Steel track Cabin AC
Track type
Rubber track

General information

Exploded Product Structure
  1. 1. Canopy Frame Assembly

    The canopy roof and support frame form one verified overhead protection assembly above the operator position.

  2. 2. Operator Station Assembly

    The seat, control levers and console remain one mounted operating assembly for direct machine control.

  3. 3. Boom Assembly

    The boom carries its verified hydraulic cylinder and hose routing from the upper-body pivot to the wrist joint.

  4. 4. Dipper Arm and Bucket Assembly

    The dipper arm, linkage and digging bucket work as one connected assembly at the boom outer pivot.

  5. 5. Rear Engine Cover

    The rear cover encloses the cooling and engine service area and keeps the exterior body profile complete.

  6. 6. Upper Body Housing

    This housing forms the upper mounting structure and supports the operator station and working equipment.

  7. 7. Slewing Ring Assembly

    The slewing ring joins the upper structure to the travel frame and enables controlled horizontal rotation.

General instructions

Simplified explanation

03 / Specs, Parts & Accessories

Visuals & Product Inspection

Product Video

Operation Videos · 01:26

Operation Videos

20ECO Operation

20ECO operation demo. Energy-saving drive, simple operation, smooth and efficient test running.

20ECO Operation

Operation Videos · 01:2620ECO operation demo. Energy-saving drive, simple operation, smooth and efficient test running.

Product packaging

Service Videos · 00:59Product packaging. Equipment packed in export solid wooden cases with shockproof reinforcement against bumps in long ocean transport.

Product loading into containers

Service Videos · 00:46Product loading into containers. Lifting and multi-point strapping to secure machines for transoceanic shipment.

Real Factory Footage

Real on-site records from our factory, offering a practical view of our production capability and delivery readiness.

Factory Tour

Real factory scene. Precision assembly process, item-by-item machine calibration, strict quality control before delivery.

0:00 / 0:00

04/ Product Review

Product Inspection

Product Review

We centrally purchase equipment, test the data and the machine, then publish the models that clear our review. You get a shorter path from "could work" to a quote your team can act on.

0:00 / 0:00

Product Inspection

Core Component Details

Frequently Asked Questions (FAQ)

Which sites suit this compact excavator?

The compact crawler layout is suited to controlled digging where access is limited and the work area includes soil, landscaped edges, drainage lines or prepared foundation boundaries.

How is the digging arm positioned?

The visible boom, dipper, bucket and hydraulic pivot points allow the operator to guide the digging edge through a controlled arc for trenching and localized soil removal.

What supports grading near an excavation?

The front dozer blade provides a practical grading and support point at the undercarriage, helping prepare the immediate work area before or after digging passes.

What is visible at the operator station?

The open canopy, seat, control levers and surrounding guard structure remain visible in the supplied material, so the operating position can be checked before use.

How should a work area be prepared?

Prepare a level working route, confirm the intended digging boundary and keep people clear of the operating area before beginning any controlled excavation task.